Trex Decking Stair Installation
Trex transcend and select horizontal railings are made to be installed at maximum of 6 1 83 m or 8 2 44 m on center depending upon type of railing you choose.
Trex decking stair installation. Cohen and sons inc d b a the iron shop based in pennsylvania under a trademark license agreement with trex company inc. Only trex has been proven in the field for almost twenty. This guide will take you through all the steps you need to create a beautiful outdoor living space that fits perfectly into your or your client s lifestyle. A picture frame creates a professional look but does require additional framing.
Trex installation guide in your hands you re holding everything you need to begin building with trex decking railing. Attach boards on each post with trex recommended composite screws quantity of 2 per each board end. Use this measurement to determine the number and height of the risers. And if you re still feeling overwhelmed consider hiring a trexpro to build a deck for you.
Set a long level or straight 2 x 4 on top of the decking and measure the height at the point where you want your steps to end. One solution is to picture frame the deck by installing trex deck boards around the perimeter. If building over a timber substructure you should consider using trex protect self adhesive butyl tape to prevent moisture damage. In this final deck construction video chris blue installs trex transcend composite decking on both the front wrap around step and back landing step.
Find out with our series of deck installation tutorial videos and downloadable guides. Learn the basics of measuring scoping and installing your decking and railing and go from dream to do. Those railings are not true 6 72 or 8 96 in length. Trex signature railing and rod rail are made to be installed at maximum 6 or 8 clear span between posts.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube. Trex spiral stairs are manufactured and sold by m. Trex can be installed over timber steel or aluminum substructures with joist centers at a maximum of 400mm apart. For example if the height is 55 inches divide this measurement by 7 the ideal height in inches for each step.